Hunter Power to chew up forests
Play
Stop
The latest renewable energy plan seems to include a revamp of the Hunter power station Redbank near Singleton.
The intention is use wood to create the steam for the turbines. Conservationists in the NSW North Coast forests are horrified that forests will need to be felled for fuel to allow Redbank to generate coal-free power.
(Visited 15 times, 1 visits today)
Download Audio